PR CLUSTER 1
Resolved
Mar 08 at 04:52pm AST
UPDATE
THE MIGRATION TO OUR NEW VPS AT PR CLUSTER 1 HAVE BEEN SUCCESSFULLY COMPLETED.
Affected services
Created
Mar 08 at 03:20pm AST
Scheduled Maintenance Notice
We will be performing scheduled maintenance on PR CLUSTER 1.
This maintenance is required to expand our infrastructure by adding an additional VPS node in order to distribute load from the primary server and improve overall system stability.
As part of this process:
- A new VPS will be added to the cluster.
- Workloads will be redistributed to balance system resources.
- All Bridge Technologys machines and current ecosystem integrations will be migrated to the new cluster node.
- The primary server will also undergo routine maintenance and optimization.
During this maintenance period:
- Several systems and services will be temporarily shut down while migration and infrastructure adjustments are performed.
- Services connected to Bridge Technologys infrastructure may experience temporary interruptions or degraded performance.
The maintenance may finish earlier than expected if all systems are migrated and verified successfully before the scheduled end.
Our goal with this upgrade is to improve scalability, reliability, and long-term infrastructure performance.
We appreciate your patience and understanding while these improvements are being deployed.
Affected services